- Construction Date: 2016
- Location: Gaza Strip
- Employer: Palestinian Water Authority (PWA)
- Work Description: Design and Construction of about 37 Kilometers of water distribution system; Replacement of about 21 kilometers of old and undersized water pipes; Construction of North South Carrier consisting of about 42.5 Kilometers of pipeline with diameter ranging from 200mm up to 1600 mm; Construction of North loop consisting of about 16.2 Kilometers of pipeline with diameter ranging from 200 mm up to 1000mm; Construction of Middle loop consisting of about 11 Kilometers of pipeline with ranging from 200mm up to 600 mm; Construction of South loop consisting of about 25.2 Kilometers of pipeline with diameter ranging from 200mm up to 800mm; Construction of about 12 pumping stations; Construction of 5 main booster stations along the carrier; Construction of blending water tanks for a total capacity of 200,000 m³.
- Contract Construction Value: 200,000,000
- Category: Infrastructure / Management & Planning
Design Services, Tender Documents, Supervision & Construction Management for Gaza Sustainable Water Supply Program – Associated Works to Gaza Desalination Plant