- Construction Date: 2012
- Location: Gaza Strip
- Employer: Ministry of Foreign Affairs – State of Qatar
- Work Description: Design Services for 12.5Km of Roads, Storm Water Networks, pile filters, Infiltration Areas, Sewerage system, Water supply Network, Electrical high and low voltage networks, electrical transformers, electrical led light poles, solar system for street light, telecommunication network, irrigation system &all the project Electromechanical Works.
- Contract Construction Value: 48,000,000
- Category: Transportation / Infrastructure
Al Karama Road
